Thursday, July 22, 2010

Bathroom Part 2

I fell off the wagon with my updates on the bathroom redo at my FIL's. But now I'm back on  the case. These are shots from our second weekend at work. You can see that we got all the green board installed  along with the tile and tub. Nothing is grouted here,  but we left that for the next weekend.
The tile were just regular subway tile in a running bond. The inserts were glass tile in a variety of blue tones.We bought all of the things for the bathroom at Lowe's.
Below is  the other side of the bath. All of the wallpaper was removed and all the surface defects were fixed with drywall patch. 


View from the doorway. We kept the original layout intact because there was really no way to change things around.
Posted by Picasa

No comments:

Post a Comment